http://www.polyusgold.com/ sitemap русский contacts text size small text size large
eng6


Polyus Gold / Investor Relations / Reports print version

International Audit of Reserves (JORC Code)

Reserves and resources (JORC Code)

Measured, indicated and inferred resources (Russia)

Resources are inclusive of reserves.

Deposits

Measured

Indicated

Total measured and indicated.
Gold (thousand ounces)

Ore
(million tonnes)

Grade (g/t)

Gold (thousand ounces)

Ore
(million tonnes)

Grade (g/t)

Gold (thousand ounces)

Operating facilities

Krasnoyarsk region

Olimpiada1

19.3

5.00

3,131

79.8

3.70

9,616

12,747

Blagodatnoye5

3.4

2.50

271

132.8

2.40

10,230

10,501

Titimukhta3

9.7

3.10

950

17.6

3.10

1,750

2,700

Republic of Sakha (Yakutia)

Kuranakh1

1.8

1.90

106

160.4

1.20

6,447

 6,553

Irkutsk region

Lenzoloto1

32.17

0.228

2379

169.8

0.42

2,091

2,328

Total

66.3

2.20

4,695

560.4

1.67

30,134

34,829

Projects

 

 

 

 

 

 

 

Magadan region

Natalka2

163.9

1.74

9,166

626.9

1.52

30,543

39,709

Irkutsk region

Verninskoye6

2.0

3.00

200

72.9

2.70

6,434

 6,634

Chertovo Koryto4

4.1

1.85

247

46.4

1.84

2,742

 2,989

Total projects

170

1.76

9,613

746.2

1.66

39,719

49,332

Total

236.3

1.88

14,308

1,307

1.66

69,853

84,161

Deposits

Inferred

Ore
(million t
onnes)

Grade

(g/t)

Gold

(thousand ounces)

Operating facilities

 

 

 

Krasnoyarsk region

Olimpiada1

37.2

3.10

3,666

Blagodatnoye5

36.1

2.20

 2,555

Titimukhta3

3.6

2.40

270

Republic of Sakha (Yakutia)

Kuranakh1

7.3

1.50

346

Irkutsk region

Lenzoloto1

29.2

0.62

 520

Total

113.4

2.02

7,357

Projects

 

 

 

Magadan region

Natalka2

472.4

1.42

21,538

Irkutsk region

Verninskoye6

52.1

1.80

2,953

Chertovo Koryto4

2.1

1.64

109

Total projects

526.6

1.45

24,600

Total

640.0

1.55

31,957

1.     Audited in October 2006 by Micon International Co. Limited.
2.     Audited in July 2007 by Micon International Co. Limited.
3.     Audited in June 2008 by Micon International Co. Limited.
4.     Audited in January 2008 by Micon International Co. Limited.
5.     Audited in November  2008 by Micon International Co. Limited.
6.     Audited in December 2010 by Micon International Co. Limited.
7.     Thousand cubic meters (m3).
8.     Grams per cubic meter (g/m3).
9.     Conversion of sands was based on the ratio of 2 metric tonnes per 1 cubic meter.

Proved and probable reserves

Deposits

Proved

Probable

Total proved and probable.
Gold (thousand ounces)

Ore
(million tonnes)

Grade (g/t)

Gold (thousand ounces)

Ore
(million tonnes)

Grade (g/t)

Gold (thousand ounces)

Operating facilities

Krasnoyarsk region

Olimpiada1

19.0

4.90

3,005

87.0

3.60

10,041

13,046

Blagodatnoye5

3.1

2.30

226

132.1

2.27

9,633

9,859

Titimukhta3

7.7

3.30

817

13.4

3.30

1,422

2,239

Republic of Sakha (Yakutia)

Kuranakh1

31.9

1.60

1,646

1,646

Irkutsk region

Lenzoloto1

12.57

0.328

1289

104.8

0.52

1,603

1,731

Total

42.3

3.07

4,176

369

2.05

24,345

28,521

Projects

 

 

 

 

 

 

 

Magadan region

Natalka2

242.3

1.30

10,291

883.1

1.10

30,550

40,841

Irkutsk region

Verninskoye6

2.1

2.90

200

63.3

2.70

5,555

5,755

Chertovo Koryto4

3.8

1.80

218

39.8

1.84

2,352

2,570

Total projects

248.2

1.34

10,709

986

1.21

38,457

49,166

Total

290.5

1.57

14,885

1 355.4

1.44

62,802

77,687

1.     Audited in October 2006 by Micon International Co.  Limited.
2.     Audited in July 2007 by Micon International Co.  Limited.
3.     Audited in June 2008 by Micon International Co. Limited.
4.     Audited in January 2008 by Micon International Co. Limited.
5.     Audited in November  2008 by Micon International Co. Limited.
6.     Audited in December 2010 by Micon International Co. Limited.
7.     Thousand cubic meters (m3). 
8.     Grams per cubic meter (g/m3).
9.     Conversion of sands was based on the ratio of 2 metric tonnes per 1 cubic meter.

up
CompanyOperationsInvestor RelationsCommunity RelationsMedia Relations
legal disclaimer